HomeProjects New industrial building Abengoa

New industrial building Abengoa

Rotterdam

The new industrial building forms part of a carbon-capture plant in Rotterdam.

The project

Notable features of the project were:

  • Partially underground (11.5m)
  • Concrete work: 500m3 (concrete foundations)
  • Cast piles (26m)
  • Steel construction and sidings
  • Prefabricated concrete plinth at base of facade
  • Overhead cranes
  • Concrete foundations for external equipment
  • Constructed next to existing operational buildings

Facts and figures

  • Site
    Botlek, Rotterdam
  • Client
    Linde Gas Benelux B.V.
  • Status
    Completed
  • Contract type
    Bouwteam (Construction team)
  • Consultant
    Linde Gas Division (DE)
  • Project categories
    Chemical
    Gas
+