Construction of a drinking water reservoir of 3850 m3. This included foundations, round prestressed concrete tank (23m diameter, 11m high) and architectural finishes.
The project consisted of the construction of a prestressed concrete storage tank 23m diameter; 10m high (climb), and further:
The work was carried out in close proximity to roads and in an operational area. Visser & Smit Bouw has therefore coordinated all the logistics and transport elements. The site layout took into account the location of the project in a protected water catchment area.
Visser & Smit Bouw
Building team partners:
Visser & Smit Hanab (Papendrecht)
Visser & Smit Hanab Installatie (Heemskerk) + Alewijnse