The works commissioned by the technical and construction departments of the NKI-AVL include all common maintenance, minor alterations, small modifications and painting.
MedicomZes has participated in the multiannual maintenance plan drawn up in 1998, which is based on a schedule of requirements from the client.The work will be carried out in close cooperation with staff of the technical and construction departments and the users of the remodelled areas. MedicomZes is well adapted to carrying out these works in the functioning hospital environment with minimal inconvenience to users, patients and visitors.
The ground floor is primarily for outpatient visitors, radiotherapy and the x-ray department. On the first floor are the staff related rooms, offices, library and restaurant facilities. On the second floor of the new building are the operating theatres and treatment departments. The wards are built over three storeys and stands by means of a technical floor on the new treatment block
The existing high-rise houses the research department and in the underlying low-rise are the laboratories. Also, the outpatient clinic has been thoroughly renovated.
This project is delivered by MedicomZes (a trading name of Visser & Smit Bouw bv).