Refurbishment of existing building to create an office with laboratory (analytical lab 37.5sqm), smelter and mineral grinder including all building-related services.
The installations were incorporated into the existing sheds In addition, the outdoor area was hard and soft landscaped.
The work was characterised by a high level of finish where sustainability played an important role; a high efficiency underfloor and space heating/cooling system was installed. In addition, the existing area was upgraded. The shell remained intact.
Temporary accommodation was built for the duration of the works.
Visser & Smit Bouw was responsible for supervision and accountability